Bathrooms · Pricing
What a bathroom remodel costs in New Jersey
Most cost pages online give you one number and hide what it covers. Ours splits a bathroom remodel into two parts, so you can see exactly what you are paying for: our labor, which we price in writing after a free visit, and the materials, which you buy yourself at cost. Every range below is for our labor only.
Labor only. Every number on this page is for our labor. Materials are not included.

How we price a bathroom.
We charge for the work: demolition and disposal, prep, Schluter waterproofing, tile and fixture installation, and cleanup. We do not mark up materials, because you do not buy them from us. You buy the tile, vanity, fixtures, glass, Schluter membrane and drain, cement board, ALL-SET mortar and grout from a product list we give you, so you see every material cost and keep control of your budget.
Labor price ranges.
Labor only. You buy the materials.
| Project | Labor only |
|---|---|
| Floor, toilet and vanity onlyThe shower stays. | $3,500 - $4,000 |
| Tub-to-shower conversionAdd the bathroom floor for $2,500 - $3,000 more. | $6,500 - $16,750 |
| Walk-in shower rebuild, same footprint | $7,000 - $16,750 |
| Curbless shower, same footprint | $8,500 - $18,500 |
| Powder room, full remodel | $4,500 - $9,000 |
| Hall or guest bath, full remodel | $12,000 - $26,000 |
| Primary bath, same layout | $23,000 - $30,000 |
| Primary bath, new layoutBigger or curbless shower, moved drain, freestanding tub. | $30,000 - $50,000+ |
These are the same ranges on our service pages and in our online price calculator. Your real number is one written price after the visit.
What moves the price inside a range.
- Moving a drain, a toilet or a wall. This is what separates a $23,000 primary bath from a $40,000 one.
- Size of the shower and how much tile goes on the walls and floor.
- Curbless construction: the floor has to be recessed, which depends on the framing.
- Niches, benches, glass and special details.
- What we find behind the walls. Anything unexpected is priced in writing before we do it.
What is not in our price.
Materials (you buy them from the product list), permit fees, and anything found behind the walls once demolition starts. We do not promise permit timelines. Permit fees are separate and handled in writing.
Why labor-only pricing works.
Because the materials are yours, you can choose the tile and fixtures that fit your budget, shop sales, and see receipts. It also means our price does not move with tile prices. The written price you sign is for the work.
What you get for the labor.
- Our own crews, not rotating subcontractors.
- The Schluter waterproofing system in every shower, set with ALL-SET mortar.
- A written 1-year warranty on our labor.
- $1M liability insurance and EPA Lead-Safe Certified Firm status.
- Weekly photo updates and a final walkthrough.
Prices by project.
Each page has the full scope and the same labor range.
Credentials.
- NARI
- Certified Kitchen & Bath Remodeler (CKBR)
- Registered
- NJ HIC reg. #13VH10766600
- Bathrooms
- 200+ completed
- 4.9 stars on Google
Questions about bathroom remodel cost.
How much does a bathroom remodel cost in NJ?
Why is your price labor only?
What is not included in the price?
What makes a price go up?
Do you give free estimates?
Is there a warranty?
Who does the work?
Book a free 30-minute visit.
Got it. We will call you.
Expect a call or text from (973) 577-9383 within one business day to set up your visit.
